Flat pack house Installation process and inspection methods

Time:2024-05-24 15:26:56 visits:29

least-expensive-modular-homes

How to install flat pack home:

1. First, place the chassis on the prepared foundation, install four hexagonal columns, then install the top frame, install the downpipe, and install the elbows as required. According to the customer's line layout, the top line should be laid with bright lines first.

2. Install wall panels, doors and windows
Install wall panels, doors and windows according to drawings. Note that the flat opening of the wall should be on the inside, and the inlaid opening should face outward. If the socket gap is large, rivets should be used to refix it. After all installation is complete, the ceiling will start from the inside.

3. Install the ceiling
First, use a drill tail line to drill the ceiling flaps on the wall panel around the box, and place the 831 ceiling on the ceiling flaps. If it is not strong, use rivets to reinforce it.

4. Install pipes and interior corners
According to the internal dimensions, cut the corresponding inner corner lines and install them. Before installing the baseboards, install color steel inner corners or PVC inner corners according to customer needs.

5. Bonding
Doors and windows should be coated with sealant to prevent air and rain leaks.

Flat pack house inspection method:

1. Arrange relevant personnel to regularly inspect and maintain the temporary construction status, and take timely measures to deal with problems and hidden dangers discovered during the inspection.

2. Before reassembling the
Flat pack house during its turnaround life, major components should be stopped and inspected and maintained. Quality inspection is passed before reuse.

3. The welds of the load-bearing frame of the house must not be welded, and rust removal and welding should be stopped for severely corroded welds. After repair, anti-rust oil should be applied to protect the active links of parts and accessories. When components and plates are bent and deformed, they should be repaired or replaced in time. When doors, windows and accessories are damaged or damaged, they should be repaired or replaced in time.

CATEGORIES

CONTACT US

Whatsapp/Wechat: +86 19710016561

Tel: +86 536 628 1777

Fax: +86 536 628 1777

Email:zonetang@zone-tang.com

Add: 500 meters west of Dashigiao Community, Zhuliu Street,Changle County.Weifang City, Shandong Province